The Luxury Collection By Marriott
The Luxury Collection By Marriott

Construction works of the hotel – The Luxury Collection By Marriott has started, where MEP installation works are performed by Domson's Engineering. 
MEP solutions include advance Cooling & Heating systems with Cooling tower & Boilers on the roof, Diesel feeding system with underground storage tank. Ventilation system is designed with high energy efficiency  recuperation and humidity control creating maximum comfort for all areas of the  building including guest-rooms, public areas and spa. 
Building is secured with central Fire Fighting and Alarm System  according to  NFPA Standards, as well as the Smoke exhaust and Pressurization Systems.  All systems are integrated in Building Management System  that can be monitored and controlled with all of its components from the central control panel.

Building will be equipped with premium quality brand products, such as Daikin, Trox, Emerson, Grundfos, Danfoss, Schneider Electric, Honeywell etc.

Total Area: 55 600 m²
Address: N2 Gudiashvili Str., Tbilisi, Georgia

 

Heating
Air Conditioning
Ventilation
Water and Sewage
Electricity
Low Voltage
BMS
Data Centers